Hanshin Electric Railway Main Line
阪神電気鉄道本線
Hanshin Main Line connects Osaka and Kobe. Some trains go thru to Kintetsu-Nara via Hanshin Namba Line and Kintetsu Nara Line, or Sanyo-Himeji via Sanyo Electric Railway Line.
Osaka-Umeda station is under construction.
Naruo station was renamed to "Naruo・Mukogawajoshidai-Mae". This diagram shows the track layout before the rename.
Platform doors are being installed in stations in Hanshin Line. This diagram does not reflect the latest status of installation.
If you notice incorrect information on our site, please let us know via correction form.
Share this page!
新着情報
Popular Pages [Sep. 2024]
- 【あの幹線も】JR東日本が「必殺徐行標識」を導入1
- Tokaido Line (Tokyo - Atami)2
- Tohoku Line (Tokyo - Kuroiso)3
- Chuo Line (Tokyo - Shiojiri)4
- Kagoshima Line (Sendai - Kagoshima)5
- Tokaido Line (Maibara - Kobe)6
- Tokaido Shinkansen7
- Tohoku Shinkansen8
- Joban Line (Ueno - Iwaki)9
- Kagoshima Line (Mojiko - Yatsushiro)10
- Odakyu Electric Railway Odawara Line11
- Yamanote Line12
- Tokaido Line (Toyohashi - Maibara)13
- Tobu Railway Isesaki Line14
- Sobu Line15
- Tokyu Railways Toyoko Line16
- Seibu Railway Ikebukuro Line17
- Tokaido Line (Atami - Toyohashi)18
- Keikyu Main Line19
- Keisei Main Line20
Date of Surveillance
Section | Date of Surveillance |
---|---|
All | As of July 2023 |
List of Versions
Version | Date Published | ||
---|---|---|---|
2.0 | HTML | ||
1.0 | HTML |
- Published
- Revised
- (Ver.2.0 published)